👉 A 1,500 billion rial solar power plant has been put into operation in Zaveh, Razavi Khorasan. 👉 The plant aims to provide 21 megawatts of electricity to a cement factory. 👉 The plant was built on a 10-hectare land and took three months to complete. 👉 A new 6-megawatt solar power plant is planned to be built in the area. 👉 The total capacity of the solar power plants will be 21 megawatts. 👉 A hydroponic greenhouse, 'Per Yas', has been built with a 4.5-hectare area and a budget of 4,000 billion rials.